Thursday, September 29, 2011

Structural Framing Complete



The final framing to resolve the structural issues has been completed. The job is 2-3 weeks behind schedule due to the design changes necessitated by the structural existing conditions, i.e. lack of columns, but progress continues. The new door frames have been installed in all of the bedrooms and closets. The new flush mount sprinker heads are being installed, the framing for the bathrooms, closets, kitchen, and counseling room is nearly complete, and the terrazzo shower bases have arrived and are ready for install. We have an issue with lead time on the lighting fixtures and our CM and architect are readying alternate plans since no suitable substitutes are available.